Full House Rewire in Wollongong Timeline, Disruption & Process

A full house rewire in Wollongong requires a licensed electrician, several on-site working days, time to reconnect the network, and planned power outages. Easther Electrical, ASP Level 2 accredited, manages the whole process.
What Does a Full House Rewire Involve in a Wollongong Home?
A full house rewire replaces all circuit wiring, the switchboard, power points, and light circuits to meet AS/NZS 3000 wiring rules. NSW law requires a licensed electrician to perform and certify the work.
This is different from fixing a fault or adding a few outlets. Every circuit in a residential home is part of one project. New cable is run through the walls, ceilings and subfloor, and a new switchboard goes in, whereas a partial rewire is a smaller job.
Before you accept a quote, check your electrician’s NSW licence; it takes only a few minutes. Easther Electrical is licensed and ASP Level 2 accredited, which matters if your rewire changes your property’s network connection.

A full rewire covers more than cable. It also includes:
- Switchboard replacement. The old board comes out, and a new one goes in, fitted with safety switches and correctly rated circuit breakers.
- Earthing and bonding. Earthing gives fault current a safe path back to the source so protective devices can trip. Bonding links exposed metal parts so they don’t sit at different voltages. Both are part of a compliant installation.
- Safety switches. A safety switch, also called an RCD, cuts power quickly when it detects current leaking to earth, protecting people from electric shock. Under AS/NZS 3000:2018, home circuits need this protection when the work is new or when the switchboard is replaced.
- Circuit breakers. Each circuit has a breaker rated in amps. The rating must suit the cable and the load on that circuit; if it doesn’t, the wiring isn’t properly protected.
How Long Does a Full House Rewire Take in Wollongong?
Duration depends on home size and access to walls and ceilings, so timeframes may vary per household. The work runs in phases: pre-wire cabling, switchboard replacement, the network application if needed, then reconnection and fit-off. Easy access will speed this up, while solid walls and tight ceiling spaces can slow it down.
Time on site is only a small part of the job. If the job involves Endeavour Energy, processing and scheduling time adds to the total, and this can vary with the type of work and network congestion. Reconnection timeframes are estimates and may vary based on application complexity, network load, and seasonal demand. You can contact Endeavour Energy directly for current timeframes.
If inspectors find defects, they must be fixed first, which adds time. The application comes before reconnection, so lodging it early helps.
At the quote stage, ask for a written schedule. It should show which days you will be without power and which stages depend on Endeavour Energy; this will help you plan around it.
Ready to move forward? Request a free quote from one of our licensed ASP Level 2 electricians.
What Disruption Should You Expect During a Full House Rewire?
Expect scheduled power cuts, access to walls and ceilings for cabling, and a full outage during switchboard changeover. Alarms, internet, and hot water go offline whenever the power is off.
Power isn’t off for the whole job. Outages are scheduled and tied to specific stages.
- Room-by-room shutoffs: the crew cuts power to each area while they wire it.
- Switchboard changeover: this is the full outage. A switchboard change usually takes a few hours to a day, so ask for the date and expected hours.
- Alarm and internet: both go offline during the changeover. Plan for work-from-home and security.
- Hot water and cooking: both lose power during the main disconnection window.
- Wall and ceiling openings: these are cut for cable runs and patched afterwards. Ask what finishing is included, such as painting.
- Access: keep the area around the meter box clear so crews can reach it.
If anyone in the home relies on powered medical equipment, or you run a home business, tell your electrician early. Outage windows are easier to plan around when they know in advance.
What Are the Steps in a Licensed Full House Rewire Process?

The steps are: quote, pre-wire cabling, switchboard replacement, Level 2 ASP network application (if required), Endeavour Energy reconnection, fit-off, then lodging the CCEW certification with Building Commission NSW.
- Site inspection and fixed-fee quote: the electrician checks access, the existing wiring and the switchboard, then confirms the scope.
- Strata or heritage checks: only if they apply to your property.
- Pre-wire: new cable is run through walls, ceilings and subfloor.
- Switchboard replacement: the old board is removed, and a new one is installed to AS/NZS 3000.
- Level 2 ASP application: sent to Endeavour Energy if the service or metering position changes.
- Disconnection and reconnection: a Level 2 ASP disconnects and reconnects supply at the network connection point and notifies Endeavour Energy.
- Fit-off: install power points, switches, and light fittings.
- CCEW issued and lodged: the electrician lodges the Certificate of Compliance for Electrical Work through the Building Commission NSW eCert portal within 7 days of testing, and you receive a copy.
Steps 5 and 6 depend on Endeavour Energy, so their timing is partly outside the electrician’s control.
Testing comes before sign-off. The electrician checks earth continuity and confirms the safety switches trip as they should. The CCEW confirms this testing was done. Endeavour Energy may also inspect the service work. Any defects must be fixed before the job is signed off as complete.
Does a Full House Rewire Trigger Level 2 ASP Electrician Requirements?
Yes, when the job changes the meter position, the service or the point of supply. NSW rules then require an ASP Level 2 accredited contractor for that Endeavour Energy network work.
Level 2 work covers the link between the street network and your property, such as service lines, the point of attachment, the meter and disconnecting or reconnecting supply. If your rewire stays on the property side of that link, it may not apply. Whether it does depends on what happens at the connection point, so ask your electrician to confirm at the quote stage, as this also affects both cost and timing.
Endeavour Energy’s network rules determine whether you need Level 2 accreditation. Meter position changes and point-of-supply changes are common triggers, but not the only ones. Confirm your property’s requirements with your electrician and Endeavour Energy.
How Much Does A Full House Rewire Cost in Wollongong in 2026?
Base rewire cost varies by house size and is quoted per job. Level 2 ASP work adds roughly $400 to $2,200 depending on what is involved. Whether network fees are included or added on top depends on the job, so ask what your quote includes.
| Work Component | Who Charges It | Typical Cost (AUD, 2026) | Applies When |
| Full house rewire (contractor labour + materials) | Easther Electrical | Quoted per job, based on home size | Every full rewire |
| Level 2 ASP service connection | Easther Electrical (contractor fee) | $800 to $1,400 | Point of supply or service connection changes |
| Metering reconfiguration | Easther Electrical (contractor fee) | $400 to $900 | Meter position or configuration changes |
| Overhead service replacement | Easther Electrical, plus network fees where they apply | $1,200 to $2,200 | Overhead service needs replacing |
Endeavour Energy sets its own network fees, and they are not always part of the electrician’s price. Ask which fees are included before you accept a quote.
These figures are Easther Electrical’s typical 2026 quoted ranges. They vary with house size, complexity and location. Request a detailed quote for your specific property.
What Compliance Documents Will You Receive After a Full Rewire?
You should receive a CCEW for the work. If the service or meter position changed, ask your electrician for a copy of any Endeavour Energy paperwork.
Keep these as proof the work is compliant:
- Certificate of Compliance for Electrical Work (CCEW): issued for the electrical work and lodged through the Building Commission NSW eCert portal within 7 days of testing. You receive a copy.
- Endeavour Energy paperwork: if the service or metering position changed, the Level 2 electrician notifies Endeavour Energy after the work. Ask for a copy of what was lodged.
- Test confirmation: the CCEW confirms the work was tested, including RCD and earth continuity checks.
Your electricity retailer appoints the metering coordinator, who looks after your metering installation. If your meter is moved or changed, they coordinate the metering work.
Read your CCEW when you get it. It should show the electrician’s licence number and a description of the work. If something doesn’t match what was done, raise it with your electrician straight away.
Need a full house rewire? Contact us to book an inspection to confirm your property’s specific requirements and receive a detailed quote, or call 02 4256 5899 to talk through your next steps and timeline.
FAQ’s
Can you stay in your house during a full rewire?
Most homeowners stay onsite. You will only be without power, hot water, alarm and internet during the scheduled outages.
Do you need council approval for a full rewire in Wollongong?
Usually not for internal electrical work, but heritage-listed homes can have extra rules. Confirm with Wollongong City Council if your property is heritage-listed.
What is the difference between a partial and full rewire?
A partial rewire replaces selected circuits or areas. A full rewire covers the whole home, from the switchboard to every power point and light circuit.
Will my rewire need Level 2 ASP work if I’m not moving the meter?
Possibly. It depends on what happens at the connection point, not only on whether the meter moves. Your electrician can confirm at the quote stage, and Endeavour Energy’s network rules apply.
What happens if defects are found during the Endeavour Energy inspection?
They must fix them before signing off the job, and any re-inspection adds time. Ask your electrician how they handle this.
Have a question about your property? Contact us for a free consultation. Easther Electrical also offers a 24/7 emergency electrician service for urgent faults found mid-rewire. For the full range of home services, visit the residential electrician page on our website.