Easther Electrical carried out an LED upgrade to Wollongong tafe internal and external lights, including retrofitting existing fittings and complete replacements. This was carried out in a short period of time with minimal disruption to the tafe.
Projects Completed
Some of our past projects we have delivered to meet all clients expectations
Working with Tiger Light, Easther Electrical installed conduits, excavation, switchboards, poles and lights to achieve a 200 lux standard across the Vickings sports field and its adjacent training field. It also included E switch automation to control the lighting.
A commercial Project with Barker constructions. Easther Electrical Installed all consumer mains, lighting, power and data for the new development in shellharbour at the time.
Working closely with Joss and stake holders, we were able to to provide a complete new centre and meet the new standards set by the department. This included electrical audits and reports of what was current on this site and then design and construct new infrastructure and wiring for minimum security inmates. This project required a high level of reliability and confidence that was needed to be maintained through the project.
Working with Joss we were contracted to provide necessary audits, testing and reporting on the current site, and then design and successfully tendered on retrofitting and upgrades of the electrical infrastructure to meet current standards under the budget provided. Due to the dedication and trust worthiness of our work we were invited to then tender on the Reintegration Centre.
Working to blue scope standards this job required a high level of safety, documentation and audits to fit out the existing building. We were able to work to a strict time line to achieve a high level fit out working with existing internal walls and ceilings.
A design and construct job we were able to provide the department of education an upgrade to the condemned poles on this site. This included the removal of the old timber poles and supply new field lighting to a training level lux.
A technical job from a planning process. We had to remove the old poles and install new poles on the rock shelf, this work had to be coordinated with other contractors, the tide and weather conditions to provide new lighting safely to our workers and the environment.
Successfully tending and working with Balliana construction we removed the old wiring, install new infrastructure, lighting power, data and security to meet Department of education standards.